Approached by Aaron Guerin of LAD Architecture for a price to produce a site plan for Cambridge Primary School director Pete McLachlan decided that this was a project that Cogswell Surveys would support and came up with a Joint Venture proposal with LAD Architecture to complete the work for the school pro bono.
The work included a detailed topographical survey of the site which included locating all buildings and features. This information was then provided to LAD Architecture who completed the building measure up and produced the final plans for the School. The plans will be used by the school for planning of future developments and extensions and will be a valuable asset for the school moving forward.
Cogswell Surveys Director Pete McLachlan said "We like to help out local schools, any money they can save can be directed towards education which has to be a good thing."